My Photo

Categories

Blog powered by Typepad
Blog powered by Typepad
Member since 09/2010

« OUT-OF-HOME ADVERTISING SPENDING UP BY 4.1% IN 2010, BUT 'EYES ON' MEASUREMENT METRIC NOT WITHOUT CONTROVERSY | Main | FACEBOOK AND BAIDU, CHINA'S SEARCH ENGINE GIANT, FORM PARTNERSHIP TO BUILD A NEW CHINESE SOCIAL NETWORK »

04/11/2011

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

chellax

Nuclear power plant construction shouldn't be delayed for it can cause serious problem to its environment. After my course from White Card Tas I had a project close to a nuclear plant...when there was a leaking on it's plant...we were forced to leave the area to secure safety and secuity...

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been saved. Comments are moderated and will not appear until approved by the author. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Comments are moderated, and will not appear until the author has approved them.

Your Information

(Name is required. Email address will not be displayed with the comment.)

Most Recent Photos

  • 2019 VC Industry Invested $66 billion through the first half of 2019  and on pace to match or exceed the record $130.6 bil invested in 2018
  • Pitching VCs
  • 2018 VC Industry Invested $82.5 billion in Late Stage startups for the Year 2018 and $30.8 billion for Q4
  • 2018 VC Industry invested $41.1 bil for the Yr and $9.1 billion in Q4 in Early Stage Startups
  • 2018 VC Industry Invested $9.1 billion in aggregate Early Stage Startups  Reaching A Decade High and Rising 43.1 percent
  • 2018 VC Industry Invested $7.5 billion in Angel and Seed Stage Startups
  • 2018 VC Industry Invesed $130.9 billion a record since 2000
  • Year 2018 Angel and Seed Deal Activity Ends On A High Note - Pitchbook
  • Capital Investment into US VC deals reaches new all-time high - Pitchbook
  • Product Adoption Curve - Product Life Cycle
  • Product Adoption Curve - huge-chasm
  • Product Adoption Curve - The Chasm